Click to Home

Go To Site Search
Translate
Translate Page Traducir a Espaňol
Town of Windsor
When do I need to call for inspections after my permit has been issued?
The required inspections are listed on your copy of the permit. All work must be inspected before it is covered up. For example, we must inspect the footing/foundation after it is excavated; installation of steel reinforcement and before concrete is poured. A minimum of 24-hours notice is required prior to each inspection. Inspections can be requested by calling (707) 522-8346.

Building Inspection

Show All Answers

1. When do you need a permit?
2. What requires a building permit?
3. What is an over-the-counter permit?
4. Do I need a permit to install a spa and hot tub?
5. Do I need a permit to rebuild or build a new deck?
6. When do I need to call for inspections after my permit has been issued?
7. Does dry rot repair require a permit?
8. Can I use the ceiling joist in the garage as a storage area by adding plywood?
9. What will my permit cost?
10. How long does Plan Check take?

9291 Old Redwood Highway, Windsor, California, 95492Ph: (707) 838-1000Fax: (707) 838-7349Work Hours