Click to Home

Go To Site Search
Translate
Translate Page Traducir a Espaňol
Town of Windsor
Project Status & Map
Current status information on Town of Windsor Capital Improvement Engineering projects and corresponding map outlining destinations of projects:

Windsor Well Replacement Project
The Town of Windsor, like most cities in Sonoma County, is facing water shortages. The Town plans well replacement to increase reliability of the water supply.  For more information read our Project Backgrounder.

Caltrans Highway 101 Widening Project:
For information on the current project from Steele Lane in Santa Rosa to Windsor River Road in Windsor, visit http://www.dot.ca.gov/dist4/101windsorhov/ or call CalTrans directly at 510-286-4444.

Our home page under "Windsor News" CALTRANS HWY 101 WIDENING PROJECT IN WINDSOR
post weekly road closures for your convenience.

Find information about construction of sound walls on Highway 101:

Public Informational Meeting regarding Proposed Sound Walls - 05/15/08 

Public Information Report regarding Highway 101 Widening Project - 09/03/08

Proposed Sound Wall Locations along Hwy 101 corridors Windsor Map - 07-21-09

Proposed Hwy 101 Airport Boulevard and Fulton Road Interchange Project - 01-20-10

Contact: Rey Centeno, Caltrans Project Manager (510) 286-5800
Contact: John Maitland at SCTA (707) 565-5373

Windsor Creek Pedestrian Bridge
Hampton Inn Ped Bridge 004_thumb.jpg
Windsor Creek Pedestrian Bridge
The Town of Windsor is excited to announce the December 2009 opening of the Windsor Creek Pedestrian Bridge (near the Hampton Inn).


9291 Old Redwood Highway, Windsor, California, 95492Ph: (707) 838-1000Fax: (707) 838-7349Work Hours